Gasboy Atlas Start-up User Manual Page 189

  • Download
  • Add to my manuals
  • Print
  • Page
    / 230
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 188
MDE-4334D Atlas™ Start-up and Service Manual · July 2013 Page 6-69
Valves Hydraulic/Mechanical Components
4 Use UL-approved sealant (as required) while replacing the valves.
Note: Do not use Teflon tape.
5 Clean the valve area. Do not introduce contamination.
6 Install valves with the flow arrow in proper direction.
Note: Two-stage valve torque specifications on Hexagonal Head bo
lts is 130+/- 10-inches lbs.
Meter Check Valve
This section explains about servicing the meter check valve.
Figure 6-35: Check to Meter Orientation
O-ring
Solenoid Valve and
Filter Manifold
Check Valve
O-ring
Meter
Potential Problems
Following are the potential meter check valve problems:
Damage to hydraulic parts can occur from thermal expansion or driving over a hose, if the
valve is inoperative.
If a valve sticks open, a sale may register when you first
turn the nozzle hook On with the
nozzle closed. Check STP check valves for problems.
Stuck valve can cause reduced flow rates
Leaks
Calibration problems
Service Steps
Following are the steps for servicing the meter check valve:
Check valves are not rebuildable. Replace any defective check valves.
Wear eye protection while replacing any check valve.
To service valves, proceed as follows:
1 Close and test the shear valves for dispensers.
2 Shut off power to the unit and any involved STPs. Use OSHA lockout/tagout procedures.
3 Open the nozzle into an approved container to bleed pressure. Some residual pressure may
remain.
Page view 188
1 2 ... 184 185 186 187 188 189 190 191 192 193 194 ... 229 230

Comments to this Manuals

No comments