SERIES 9100Q PUMPS AND DISPENSERS INSTALLATION/OPERATION MANUAL 038700 REV. 12/03/03 INSTALLERS - IMPORTANT In addition to instal
GASBOY Series 9100Q 2-4 12/03/03 SINGLE PUMP/REMOTE DISPENSER DIMENSIONS
Installation 12/03/03 2-5 TWIN PUMP/REMOTE DISPENSER DIMENSIONS
GASBOY Series 9100Q 2-6 12/03/03 011986 BASE LAYOUT, MODEL 9152QTW1
Installation 12/03/03 2-7 011987 BASE LAYOUT, MODELS 9152QTW2, 9153QTW2
GASBOY Series 9100Q 2-8 12/03/03 011988 BASE LAYOUT, MODEL 9153QTW1M
Installation 12/03/03 2-9 011989 BASE LAYOUT, MODELS 9152Q, 9153Q
GASBOY Series 9100Q 2-10 12/03/03 011990 BASE LAYOUT, MODELS 9152QXTW2, 9153QXTW2
Installation 12/03/03 2-11 011991 BASE LAYOUT, MODEL 9140QX
GASBOY Series 9100Q 2-12 12/03/03 011992 BASE LAYOUT, MODELS 9152QX, 9153QX
Installation 12/03/03 2-13 011993 BASE LAYOUT, MODELS 9152QXTW1, 9153QXTW1
035282 Rev. 1267 GASBOY INTERNATIONAL LLC. 707 North Valley Forge Rd. Lansdale, PA, 19446 ● (215) 855-4631 ● FAX: (215) 855-0341 IMPORTANT WAR
GASBOY Series 9100Q 2-14 12/03/03 011994 BASE LAYOUT, MODEL 9140Q
05/05/03 3-1 Section 3 CONTROL LINES PURPOSE This section is provided to familiarize the installer with the control inputs and outputs that
GASBOY Series 9100Q 3-2 05/05/03 RETURN The return is the AC current return line back to the breaker panel for all attached devices (pump motor, re
12/03/03 4-1 Section 4 WIRING ☎ Customers and installers having any questions pertaining to the installation should contact their GASBOY distr
GASBOY Series 9100Q 4-2 12/03/03 GROUNDING To ensure proper operation of the equipment and provide the necessary safety factors, this unit must be
Wiring 12/03/03 4-3 WIRE SIZE The table below shows the required AC wire size for suction and submersible pumps based on the HP rating of the pump
GASBOY Series 9100Q 4-4 12/03/03 CONDUIT All wiring to the GASBOY Series 9100Q dispensing unit must be installed in threaded, rigid, metal conduit.
Wiring 12/03/03 4-5 WIRING DIAGRAMS The following pages contain wiring notes and wiring diagrams. Consult the appropriate wiring diagram for your
GASBOY Series 9100Q 4-6 12/03/03 024212 WIRING DIAGRAM Models: 9152QX 9153QX 9140QX
Wiring 12/03/03 4-7 024213 WIRING DIAGRAM Models: 9152QXTW1 9152QXTW2 9153QXTW1 9153QXTW2
05/05/03 Contents-1 CONTENTS IMPORTANT WARNINGS AND SAFEGUARDS FOR COMMERCIAL PUMPS CONTENTS...
GASBOY Series 9100Q 4-8 12/03/03 024214 WIRING DIAGRAM Models: Satellite Island-Oriented Nozzle (side), 215Q/9152QX, 9153QX Satellite Island-Orie
Wiring 12/03/03 4-9 024222 WIRING DIAGRAM Models: 9152QTW2 9153QTW2 9153QTW1M
GASBOY Series 9100Q 4-10 12/03/03 024223 WIRING DIAGRAM Models: 9152QTW1
Wiring 12/03/03 4-11 024224 WIRING DIAGRAM Models: 9152Q 9153Q
GASBOY Series 9100Q 4-12 12/03/03 024225 WIRING DIAGRAM Models: 9140Q
Wiring 12/03/03 4-13 024320 WIRING DIAGRAM Models: Satellite Lane-Oriented Nozzle, Front Load 215QZ/9152QX, 9153QX Satellite Lane-Oriented Nozz
05/05/03 5-1 Section 5 PULSERS GENERAL A pulser is an optional device which is used when external monitoring of the dispensing unit operation
GASBOY Series 9100Q 5-2 05/05/03 REED PULSERS NOTE: See Pulser, Wiring section for proper selection of pulser wires.
Pulsers 05/05/03 5-3 ELECTRONIC PULSERS NOTE: See Pulser, Wiring section for proper selection of pulser wires.
GASBOY Series 9100Q Contents-2 05/05/03 024223 Wiring Diagram ...
05/05/03 6-1 Section 6 START-UP COMPLETION CHECK LIST The information below should be reviewed to help verify the proper installation of the
GASBOY Series 9100Q 6-2 05/05/03 5. Dispensing units equipped with an optional light assembly, should have the light assembly tested to verify prop
Start-Up 05/05/03 6-3 Calibration All GASBOY pumps and remote dispensers are adjusted for accurate measure at the factory. However, it is the resp
05/05/03 7-1 Section 7 OPERATING SEQUENCE PUMP 1. AC Power (115 VAC/230 VAC Int’l) must be provided to the pump motor feed and reset motor f
05/05/03 8-1 Section 8 PREVENTIVE MAINTENANCE GENERAL GASBOY pumps and remote dispensers are designed and constructed to give many years of u
GASBOY Series 9100Q 8-2 05/05/03 Operate with Reasonable Care Like any machine, the pump or remote dispenser that is operated with reasonable care
Preventive Maintenance 05/05/03 8-3 Cleaning the Strainer Clean the strainer immediately after the pump has been installed and tested, and again a
05/05/03 1-1 Section 1 INTRODUCTION PURPOSE The GASBOY Series 9100Q Pumps and Dispensers Installation/Operation Manual is provided to assist
GASBOY Series 9100Q 8-4 05/05/03 smudges which resist soap and detergents, will have to be removed with a stronger cleaner. (DO NOT use ordinary st
GW01 - 6/04/02 Rev. 1 WARRANTY General Statements: Gasboy International LLC. warrants all new equipment manufactured by Gasboy against defective ma
GASBOY Series 9100Q 1-2 05/05/03 Other standard features and specifications of the Series 9100Q are: • Cabinet: Painted black top and sides, whit
12/03/03 2-1 Section 2 INSTALLATION INSTALLATION PRECAUTIONS All installations must conform with all building/fire codes, all Federal, State,
GASBOY Series 9100Q 2-2 12/03/03 14. DO NOT use the GASBOY fuel dispensing equipment to remove water ballast from the storage tank. 15. DO NOT us
Installation 12/03/03 2-3 A Listed emergency shut-off valve (OPW 10RUS or equal) must be installed under each remote dispenser with the shear groov
Merci