MDE-4331M Atlas® Fuel Systems Installation Manual · September 2014 Page 6-25
Calibration Installation
Electrical Related Items
Item Procedure Refer To Checked
1 Equipment must be installed in conjunction with an emergency power
cut-of
f to remove all power from the equipment in case of an
emergency.
MDE-4333 Atlas Fuel
Systems Site
Preparation Manual
FE-356 and FE-357
Fi
eld Wiring Diagrams
“Grounding” on
page 7-6
2 STP isolation relays are required for all dispensers.
3 Retail electronic only: Use twisted-pair wires as specified for new
installations, or where new wires are pulled. Do not use shielded wires.
4 All wiring must be stranded with copper of specified gauge and
insulation ca
sing.
5 All gr
ounds must be properly connected as per the installation manual
require
ment
s as well as state, local, and national codes.
6 Conduit must be approved for hazardous locations and properly sized
for the wirin
g involved.
NFPA 30A
•NFPA 70
UL 87
•NEC
7 Properly size all circuit breakers for the
unit
s/unit options involved. NEC and local codes
8 All electronic unit pump/dispenser wiring must be properly spaced and
isolated from wir
ing for electrically noisy devices such as variable
speed STPs, station equipment motors, and other devices.
MDE-4333 Atlas Fuel
Systems
Site
Preparation Manual
9 All power wiring and circuit breakers to Gasboy equipment must be
dedicate
d and not shar
ed with other equipment.
10 All circuit breakers to Gasboy equipment must be clearly labeled and
r
eadily accessible.
11 Isolation relays must be used for dispensers to ensure that the power
is completely remo
ved f
rom a dispenser during service power down.
12 All pumps/dispensers must be wired to the same pha
se of
electrical
power.
13 New site wiring must be Megger-tested. Old site wiring must be
co
ntinuity and short-tested with a digital meter.
“Testing New Field
Wiring” on page 6-17
14 Remove all tie-wraps that secure pulsers and ensure that the pulser is
able to float (in pump
s
).
“Completing Field
Wiring” on page 6-18
15 For units with optional TopKAT PLUS, verify if power supplied to the
micro
feed matches the setting
of the power supply setup jumpers in
the TopKAT PLUS or damage may occur.
For information on
setting these jumpers,
refer to MDE-5013
TopKAT PLUS
Installation Manual.
Calibration
Though all units are calibrated at the factory, all units must be checked for calibration and
recalibrated as required, before their use by customers.
Note: Units must be properly purged before calibration or calibration verif
ication.
Incomplete purging of air can result in inaccurate calibration or errors in calibration
verification testing.
Calibration is accomplished by first pumping the product into
a
correctly sized prover can to
determine the accuracy of the unit. The size of the prover can is established by Weights and
Measures (W&M), depending on the flow rate of the unit.