Gasboy 9800A User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
MDE-4863 Gasboy® 9800A or 2600A Pump Interface Kits Installation Instructions · October 2009 Page 7
Installation of the 9800A/2600A Pump Interface Kit
6 Slip the washers onto the threaded end of the standoffs. Screw the standoffs on the platform
base (see
Figure 5).
Note: Newer platforms will have two pre-fixed standoffs, in which case, the loose washers and
standoffs will not be used.
Figure 5: Side View
Washer
Standoff
6-32 Screw
CPU PCB
7 Connect the Pump I/F PCB to P8 of the CPU PCB.
8 Secure the PCB using two 6-32 screws.
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments